Tuesday, November 11, 2014

FALL CLEANSINGS 27

I continued with the rollerwork, bottom and top coats. Just those two uses of the roller were more than enough for me. I do not object to brushwork being far slower, as I like to meditate, daydream, contemplate...

...so I was quite happy when the second roller stint was over and done with. Back to brushwork and enjoying the painting. I began by joining tne rollerwork and brushwork up. This was a bit like filling in gaps. Gradually, I progressed around the stairway top and painted some patches of the upper hall.



The banana and butternut is coming on fine, by the way. The yeast frothed up and the butternut began to rise and fall, with the banana sitting at the top all through.

No comments:

Post a Comment