Friday, June 4, 2021

IN & OUT MID-MARCH 2021

 



The workmen took 1.5 days to remove the cavity wall insulation and clear up after themselves. Above you can see the state of the front bathroom drain after they had finished the job and departed. Hopefully I will not have to get the plumber out yet again to unblock the drain, rather than pipe.



Whilst they did a good job - for workmen - on clearing the resultant muck up after their job, being a fuss pot I had to despair at the mess left behind after the clean up. Not too much, but a few bits of fluff/insulation remained lying about the yard/porch.



However, on the plus, my clematis survived the ordeals of 3 sessions of exterior work on the house in 6 months, and the new air-blocks look nice. But, oh dear....whattamess!



Around the back was much the same - the usual mess that even the tidiest of workmen leave behind after their job is done was in situ. Rubble and dust around the rear kitchen drain.



The two down pipes were not in much better shape - and I wonder if within the month the plumber will get paid once more from the aftermath of the latest work on the property.



Both rear....and front....looked clogged with debris and dust. Hopefully not enough to cause the plumber to take early retirement.