I
was all ready to move in to the newly redecorated bedroom
mid-January. Liz said I should move in as soon as I could, rather
than fuss about waiting for the final piece of furniture to arrive,
so I did - on January 16th right after our discussion. Above you can see
the collection of new items I moved in with.
Here
is the now empty spare room. I say empty, but it is not really - I
have plenty of guests already living in there that were sharing it
with me before I moved back upstairs - as in a collection of at least a half dozen spiders! They
seem to congregate around the computer area - I wonder if they like
me playing Song Pop at Facebook and/or my monthly Ligmincha Dharma
webcasts?
And
here it is - the final piece of flat-pack furniture, that arrived 2
weeks after the rest due to getting lost in the warehouse. It has
since been unpacked, built, and put into use.
As
February arrives, I contemplate. My main plan is to fix the
garden/exterior during 2017 (and fix up the coffee lounge, which
should only cost £50-75) 'as and when' savings permit. I then have
2018/19/20 - a maximum of three years - in which to save enough to
completely re-do my bathroom and alleyway.
Even
if I do 'all that I can do' myself, removing a bath tub and either
replacing it and installing a real shower over it OR having a shower
cubicle installed and doing away with the bath altogether is going to
cost a MINIMUM of £2000. Once done, it will add value to the house
and be hopefully set for 5-10 years before repairs are required, but
it is a major expense looming ahead that may hold off the repointing
that will probably be required within the next 5 years.
No comments:
Post a Comment